Installations in Romania
TreeSystem built up over than 10 MW of structures for ground mounted plants according to the romanian standard for the wind load CR 1-1-3/12 and snow load CR 1-1-4/12.
3 MW, Goiesti, Dolj.
2 MW, Salonta, Bihor.
1,2 MW, Mitresti, Mures.
1 MW, Nimigea de Jos, Bistrita-Nasaud.
1 MW, Nimigea de Jos, Bistrita-Nasaud (Ampliamento)
150 Kw, Timisoara, Timis.
40 Kw, Gottlob, Timis
12,5 Kw, Miercurea Nirajului, Mures